The Brindley 12MW Battery Energy Storage System (BESS) required the design, installation and commissioning of a full Balance of Plant solution, metered at 33kV and connected to a primary substation over 1km away. Pascon delivered a containerised substation solution, including dual substations, switchgear and 110V battery chargers, alongside the excavation and installation of 1,250 metres of fibre cable to link the new system with the existing primary substation at Swindon. The project was completed ahead of schedule and within budget. The facility was fully energised, giving SSE access to a reliable 12MW battery storage resource.

icon-metering
icon-power

Background

  • Design, installation and commissioning of Balance of Plant for a 12MW BESS
  • Metered at 33kV
  • Connection to a primary substation more than 1km from the site

Solution

  • Created a containerised substation solution
  • BoP included dual substations, Switchgear, 110v Battery Chargers
  • Excavated and laid 1,250m of fibre cable, connecting existing primary substation at Swindon.

Benefit

  • Successful project delivered ahead of time and on budget
  • Energised, by the start of September 2023
  • Adopted by SSE, the customer, now has access to a 12MW battery storage facility